Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Equinox Engineering is partnering with Farmington Bay WMA to permit, design and provide construction oversight for this wetland restoration project. Design features include creation of a Johhny Boat Channel for sportsman access, levee bank stabilization and extension of the existing levee alignment to create a full independently controlled wetland cell. Design considerations include maximum water surface elevation to reduce/control hydrostatic ground water pressure under the levee system that supports Willard Bay.
Copyright © Equinox Engineering & Environmental - All Rights Reserved.