Equinox Engineering & Environmental
Equinox Engineering & Environmental
  • Home
  • Services
  • experience
  • SOQ
  • CLIENT ACCESS
    • Chalk Creek
    • Trout Creek
    • Jeremy Ranch Wetlands
    • Freeport Drain
  • Ogden Bay - Harold Crane
  • Schick Lane Wetlands
  • More
    • Home
    • Services
    • experience
    • SOQ
    • CLIENT ACCESS
      • Chalk Creek
      • Trout Creek
      • Jeremy Ranch Wetlands
      • Freeport Drain
    • Ogden Bay - Harold Crane
    • Schick Lane Wetlands
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out


Signed in as:

filler@godaddy.com

  • Home
  • Services
  • experience
  • SOQ
  • CLIENT ACCESS
    • Chalk Creek
    • Trout Creek
    • Jeremy Ranch Wetlands
    • Freeport Drain
  • Ogden Bay - Harold Crane
  • Schick Lane Wetlands

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Farmington Bay WMA J - Dike Restoration

Equinox Engineering partnered with The State of Utah Department of Natural Resources -  Farmington Bay Waterfowl Management Area to provide design and construction management services for this project.  Equinox also provided permitting services which required a full wetland delineation report.  This project partially rebuilt a historic levee footprint that was destroyed in the 1983 floods and then extended a new levee across a new alignment to create a closed impoundment that will be used to capture fresh water and create critical flyway habitat for water fowl wintering and nesting.

Photo Gallery

    ENGINEERING PLANS - quick view

      ENGINEERING DOCUMENTS - DOWNLOAD

      J Dike Construction Plans - 0.9 MB (pdf)Download
      J Dike Technical Specifications - 0.3 MB (pdf)Download

      Videos

      previous page

      Copyright © Equinox Engineering & Environmental - All Rights Reserved.